Resources

Induction Heater for FBE Coating System at L.B. Foster | Ajax TOCCO

Written by Ajax TOCCO Magnethermic | March 2, 2015

Advanced Pipe Coating Equipment Increases Birmingham Plant Capacity.

Ajax TOCCO Magnethermic recently shipped a 4,500 kW 12 pulse Pacer II induction heating system to the L.B. Foster Coated Products pipe coating facility in Birmingham, AL. The installation of this advanced equipment marks a key development in L.B. Foster’s capacity expansion plans.

The high-speed coating plant is capable of applying fusion bonded epoxy (FBE) to 12.75-inch to 24-inch pipes in lengths up to 80 feet. The new Ajax TOCCO Magnethermic system provides progressive, in-line heating of the pipe prior to application of the FBE coating and features the ability to quickly change the line’s inductors for differing pipe sizes to minimize production downtime. The L.B. Foster pipe coating facility is located on the site of American Steel Pipe.

About L.B. Foster Company

L.B. Foster Company is a leading manufacturer, fabricator, and distributor of products and services for the rail, construction, energy, and utility markets with locations in North America and Europe.

Ajax TOCCO Magnethermic, a subsidiary of Park-Ohio Holdings Corp., designs and manufactures world-class induction heating and melting equipment for various industries and applications throughout the world. In addition, the company provides a range of services and offerings including laboratory process development, preventive maintenance, equipment repair and parts, coil repair facilities, and installation services through its locations in North America, South America, Europe, and Asia. 

E-mail: info@ajaxtocco.com 
Website: www.ajaxtocco.com